Interreg - IPA CBC programme CCI2014TC16I5CB006
Published on Interreg - IPA CBC programme CCI2014TC16I5CB006 (http://www.ipa-cbc-007.eu)

Home > Updated Project Implementation Manual First Call for Proposals No 2014TC16I5CB006-2015-1 - Version 4 - October 2017

Updated Project Implementation Manual First Call for Proposals No 2014TC16I5CB006-2015-1 - Version 4 - October 2017

24.10.2017

Project Implementation Manual - First Call for Proposals
No 2014TC16I5CB006-2015-1   Version 4 - October 2017
[1]

 

Updated version of the Project implementation Manual under the First Call for proposals

- Version 4 enters into force on 24.10.2017. 

 

Summary of main modifications in Version 4 of PIM:

PIM Section Modification content
Contact Details, page 4 Address of the Managing Authority contact detail of National Authority
4. Public procurement, 4.3. Procurement procedures, Single tender – pages 16-19 Requirements regarding preparation of tender dossier for service single tender procedure and selection process under service single tender procedure are detailed as per the Instructions published on the Programme website.
6. Reporting, p. 6.2 Assessment of the PPR – pages 41-43 In the table with sources of verification, additional required documents are added for participation in project events and publicity measures.
7. Financial Management of the project, 7.2. Validation of expenditure by first level controllers – page 44 Minimum amount of EUR 2500 for verification is set. The First Level Controller will not be assigned for the project partners, which expenditures declared for verification for the reporting period are below EUR 2500
7. Financial Management of the project, 7.2. Validation of expenditure by first level controllers – page 46 The period for submission by Bulgarian Project Partners of additionally requested documents concerning validation of expenditures by First Level Controller is changed to 5 days.
7. Financial Management of the project, 7.3. Submission of Request for payment – page 48 The requirement for the Lead Partner to send the Request for Payment to the Joint Secretariat for formal preliminary check before official submission to the MA is removed. The Request for Payment should be sent via Beneficiary Portal to the Managing Authority.
8. Modification of subsidy contact – pages 63-70 Requirements for submission of documents related to requests for contract modification are clarified.
8. Modification of subsidy contact, p. 8.1 Modifications concerning project’s content/Modifications requesting notification to the JS – pages 64 and 69 The procedure for acceptance of small content changes in the approved project, which will not affect the project’s objectives and outputs and will not jeopardize the successful completion of the project, is changed. They will be no longer approved through the Progress Report, but the Lead Partner will be informed by the Joint Secretariat via the beneficiary portal whether the respective change is acceptable or not.
Annex 14.1 Tender dossiers for Single tenders In Instructions to tenderers, p. 4 Additional information the term “selection criterion” is replaced by term “award criterion”.
Annex 8.1 Declaration of Withdrawal of PP The confirmation and signature of the Lead Partner are removed.
Annex 15 User manual for the beneficiary portal Instructions are updated in p. IV. Preparation and submission of Project Procurement Plan, V. Entering information for contractors and payments, VI. First level control – request and reporting, VII. Preparation and submission of Requests for payment, VIII. Reporting, IX. Contract modifications.

 

 

Files: 
PDF icon pim_bg-mk_2014-2020_1st_call_version_4_october_2017.pdf [1]
Package icon annexes.zip [2]
PDF icon pim_revision_table_october.pdf [3]

The web-site is co-funded by EU trough the INTERREG - IPA Cross-border Programme CCI 2014TC16I5CB006
This publication has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of 
the Ministry of Regional Development and Public Works of Republic of Bulgaria and can in no way be taken to reflect the views of the European Union


Source URL: http://www.ipa-cbc-007.eu/implementation-stage-news/updated-project-implementation-manual-first-call-proposals-no-1

Links
[1] http://www.ipa-cbc-007.eu/sites/ipacbc-bgmk-105.gateway.bg/files/pim_bg-mk_2014-2020_1st_call_version_4_october_2017.pdf
[2] http://www.ipa-cbc-007.eu/sites/ipacbc-bgmk-105.gateway.bg/files/annexes_6.zip
[3] http://www.ipa-cbc-007.eu/sites/ipacbc-bgmk-105.gateway.bg/files/pim_revision_table_october.pdf